Residential complex LUKA, 1st phase, Czech Republic
providing of TRECOL SYSTEM for rectification of inclined shaft made from reinforced concrete, Hinton, a.s.
Project name: Residential complex LUKA,
Contractor: Hinton a.s.
Position of LKM Consult: Subcontractor of technology and equipment used for rectification including TRECOL SYSTEM supports
Termination: 09/2015
Project Description
In the 1st phase of construction is realized ensuring of construction pit, which will be used for construction of polyfunctional and residential complex LUKA II, including stabilization using large diameter piles. Project in this phase includes even building of water conduit, sewage system, caliduct and relocation of existing sewerage and rainwater drainage system.
Armature shaft AŠ1 with weight 40 tons was inclined due to settlement effects about 10 cm from vertical line. Aim of LKM construction group activities was compensation of inclination using hydraulic equipment in combination with temporary TRECOL SYSTEM supports, which were active during intensification of foundation (after successful sanitation were temporary supports released).
LKM Consult delivery
- creating of concept for rectification of inclined shaft
- technical support on construction site
- subcontractor of TRECOL SYSTEM supports
- construction works, hydraulic equipment operation