Extradosed bridge across the Nosicka dam alongside Puchov - structural design, Slovakia

Extradosed bridge across the Nosicka dam alongside Puchov - structural design, Slovakia

design of construction methods, static calculations, shop drawings for bridge substructure and superstructure

More information

The Old Bridge over the Danube River in Bratislava

The Old Bridge over the Danube River in Bratislava

the concept and project for removal of the bridge, processing of technological procedures

More information

Bridge on the D35 across the railway station near Uhersko - built by rotating

Bridge on the D35 across the railway station near Uhersko - built by rotating

TRECOL SYSTEM support-technology for rotating of two bridge box girders 87 m long, each with weight 4.500 ton

More information

Reconstruction of a railway bridge over the Výmola creek in Úvaly u Prahy

construction works within complete reconstruction of the bridge, Viamont DSP a.s.

Project name: MODERNISATION OF A RAIL SECTION, PRAGUE BĚCHOVICE – ÚVALY, BRIDGE 387.144 KM (VÝMOLA)
Contractor: Viamont DSP a.s.
Position of LKM Consult: SUBCONTRACTOR for implementation of monolithic structures, building management
Termination: 09/2015

Project Description

The reconstruction of the arch bridge with nine parabolic arches with 9.70 m long spans and a total length of 132 m involves construction of a new RCC slab with overhanging consoles including follow-up structures. The main part of the bridge was constructed using DOKA overhead moveable form traveller, and the parts near abutments were constructed using stationary scaffolding. The construction proceeded in a tight space, within width of the arch section – just one 4.1 m wide.

LKM Consult delivery:

  • construction management and coordination of operations on the bridge deck
  • preparation of the concreting equipment and concreting management for the bridge deck on a DOKA moveable form traveller